City of Coalinga

Coalinga Street Beautification Project ELM AVENUE (SR 198) BEAUTIFICATION PROJECT (2010-2013)
This project incorporated pedestrian walkway design along Elm Avenue (SR 33/198) in the downtown business district, including, modified and standard handicap curb ramp design, curbs & gutters, sidewalks, street lighting, shade tree landscaping and other associated improvements on Elm Avenue (SR 33/198) from Third Street to Seventh Street.

Performed all required construction surveying and staking services as requested by the project contractor. Set survey control monuments along the project route as required.

Provided City of Coalinga Project Inspector with construction support to meet America Recovery and Reinvestment Act requirements.

SCADA Water Treatment Plant Improvements SCADA Water Treatment Plant Improvements
PLC Control Panels (total of 7)
SCADA Hardware and software (all programming by applications programmer)
Fiber optic network including WiFi access points and radios
Equipment Demolition and waste
Site Electrical Materials
Site Electrical Labor

Elm & Cambridge Signalization Elm Ave. (SR 33) and Cambridge Ave. Intersection Project
Demolition of existing improvements, minor cold planing, sawcutting, installation of curb and gutter, curb, sidewalk, curb ramps, valley gutter, A.C. pavement, aggregate base, fire hydrant removal and relocation, electrical conduit, electrical wire, pull boxes, traffic signal, traffic striping, traffic signage, existing utility lid adjustment, and construction surveying.


Sunset Street Rehabilitation Sunset Street Rehabilitation
Demolition of existing improvements, clearing and grubbing, sawcutting, pulverization of existing A.C. pavement, grading base material, installation of curb and gutter, sidewalk, curb ramps, alley approaches, driveway approaches, valley gutter, median island, park island, A.C. pavement, aggregate base, storm drain manholes, storm drain inlets, storm drain piping, electrical conduit, electrical pull boxes, traffic striping, pavement markings, traffic signage, existing utility lid adjustment, landscaping hardscape, and construction surveying.
Sunset Street Construction Notice

Click to expand


Polk Street Rehabilitation Polk Street Rehabilitation Project
Demolition of existing improvements, sawcutting, pulverization of existing A.C. pavement, grading base material, installation of curb and gutter, sidewalk, curb ramps, alley approaches, driveway approaches, A.C. pavement, loop detectors, traffic striping, pavement markings, traffic signage, existing utility lid adjustment, and construction surveying.

Redevelopment Agency of the City of Fresno

Downtown Stadium Street Beautification Project DOWNTOWN STADIUM STREET BEAUTIFICATION PROJECT (2002)
This project included decorative concrete pavement intersection design, curbs and gutters, decorative sidewalks, ornamental street lighting, median islands, street trees and other associated improvements on Van Ness Avenue, Ventura Blvd., Tulare Street, Inyo Street, and H Street surrounding the new Grizzlies Downtown Stadium.